How to properly install swing particles?
Rock particles machine installation instructions
  The rock particles machines for the entire packing, unpacking after moved to the appropriate use of local, pad level to use.
  Electrical circuit means is not subject to the restriction of the rotational direction, the line is clamped by the base below to switching, the cable card via the belt cover.
  1.1 before installing the first reference to the packing list check parts are complete and damage the rock particles.
  1.2 installation, refer to the installation diagram which rock particles machine supporting chassis must be mounted horizontally on the foundation, the foundation should have sufficient stiffness and strength to support the the vibrating screen dynamic load and static load.
  1.3 can take advantage of the screen box trunnion lifting screening machine, lifting the entire sieve can not be directly linked to the exciter.
  Should ensure that a class of non-moving parts of the screen box and hopper, chute kept to a minimum 75mm gap between 1.4 installed swing particles machine screen machine.
  1.5 swing the particle machine equipment installed, maintained around the screen surface level, otherwise, you can adjust the spring seat support pad thin sheet iron.
  1.6 springs must be in a vertical state, the spring fixation in the sieve box of the trunnion.
  1.7 the vibration sieve drive direction given is standing on the feed side, face the direction of the flow of material, observed the motor position, the left-hand side to the left to the driver, the right-hand side for the right to drive. The vibrating screen with symmetrical design, both sides pulley. Replace the motor position to change the direction of the left and right drive.
  1.8 to ensure that the tension of the V-belt has a sufficient amount of adjustment the two pulley end surface adjustment in a plane.
  The 1.9 swing particles machine before the trial must be by hand (or other) rotating exciter. Flexible rotation, the jamming before starting rock particles.
  No-load commissioning, should be less than 2 hours after the end of the installation and adjustment of 1.10 rock particles, smooth operation, no abnormal noise bearing maximum temperature does not exceed 75 ° C.
  Rock particles machine instructions
  1. Use: starting rock particles, the mixture was poured into a hopper, and by the the rotating drum swing, squeezing the material through a screen to form particles, such as crushed pieces, should be added gradually, not fill, in order to avoid pressure is too large the screen wearing. 2. Note: Hopper as powder stop high, must not spent shovel, avoid hand injury accident, application of bamboo shovel or parking.
  Rock particles machine maintenance instructions
  1. Periodically check the parts, once a month, check the worm gear, worm gear, bearing and active part of the flexible and wear, discovered defects should be repaired in time, shall not be reluctant to use.
  2. Rock particles machine should be placed on a clean dry indoor atmosphere acids and its parts shall not contain corrosive gases flowing places.
  3. The rock particles machine after use or lockout, wash or brush cleared bucket remaining powder will remove the rotating drum, and then properly installed and ready to work for the next.
  4. Disable a longer time, must be rock particles systemic wipe clean parts of the glossy coated with anti-rust oil with a cloth booth
Related News:
· Innovation, energy saving, environmental protectio  
· Vacuum dryer product performance characteristics a  
· Vacuum dryer used for inspection and debugging wor  
· Difficulties and reasons cannot start mixing machi  
· The correct operation method using vacuum dryer  
· Development advantages and characteristics of dome  
· The difference between the special vacuum dryer an  
· Detailed description of each component characteris  
· The dominant position in the whole vacuum dryer dr  
· Trough type mixer sometimes appear large area leak  
Related Products:
· PGL Spray Drying Granulator
· High speed mixer
· SET series double screw extrusion pelletizer
· VI forced mixer
· Mixing machine W series
· Powder machine ZSJ series vibrating screen
· FZ series of crushing granulator
· Chinese medicine grinder
· DWT series of drier for dehydrated vegetables
· Multi-layer belt dryer

Copyright 2013 Chang Zhou Zhizun Machinery Co.,Ltd All Rights Reserved.Design by Reach.
Tel:86.519-88906508 Fox:86.519-88902679 Add:Jiaoxi Changzhou Jiangsu Pro China P.C:213116

国产av国片精品一区二区| 欧洲精品无码一区二区三区在线播放| 人禽交 欧美 网站| 久久国产精久久精产国| 亚洲精品成av人片天堂无码| 黄瓜视频在线观看| 狠狠色噜噜狠狠狠狠蜜桃| 国产精品自在在线午夜免费 | 美女网站免费福利视频| av永久免费网站在线观看| 亚洲v国产v天堂a无码二区| 日本边添边摸边做边爱的网站| 一区二区三区国产精品保安| 国产精品无码久久一线| 精品无码国产av一区二区| 免费无码又爽又刺激激情视频| 亚洲这里只有久热精品伊人| 亚洲精品卡2卡三卡4卡2卡乱码 | av无码精品一区二区三区三级| 国产在线拍揄自揄拍无码| 成人综合婷婷国产精品久久蜜臀 | 国产玉足榨精视频在线观看| 熟妇人妻不卡无码一区| 国产亚洲精品合集久久久久| 在线精品亚洲一区二区动态图| 亚洲无av在线中文字幕| 亚洲国产区男人本色在线观看| 亚洲成a∨人片在线观看不卡| 8天堂资源在线| 亚洲成a人v欧美综合天堂| 99精品视频在线观看免费蜜桃| 日本成熟老妇乱| 人妻无二区码区三区免费| 西西午夜无码大胆啪啪国模| 国产偷国产偷亚洲高清人| 亚洲小说图区综合在线| 女人与拘做受全过程免费视频| 农村欧美丰满熟妇xxxx| 欧美videos另类粗暴| 久久人人爽人人爽av片| 情侣做性视频在线播放|