Universal grinder, mixer Groove, rock particles, machine maintenance, maintenance knowledge Daquan
Universal grinder use:
  A universal grinder for the entire packing, unpacking, moved to the appropriate location to place a smooth power, to trial.
  2, should be checked prior to use mechanical transmission parts loose and other irregularities, universal grinder running direction shall be consistent with the direction of the arrow.
  3, when used to load test for 1-2 minutes, to be seen no abnormal phenomenon before feeding, feed should be gradually increasing the amount of logistics, and observe the motor power consumption of power and functioning at any time, to be feeding the power balance in normal operation certainly die cutting gate work.
  4, the half-way as a result of material too moist knot stick too much, the impact of flour, drying materials should be or replace coarse sieve.
  5, replace the sieve just the front cover open can, install the front cover should pay attention to both sides of the hand wheel is elastic, to ensure that the front cover and the casing seal.
  6, the parking should be preceded by stop feeding, so universal grinder to run for 5-10 minutes and then stop. In order to reduce the residual materials.
  Universal grinder Cautions:
  1, check the crush cavity foreign body (before the boot must be empty), power.
  2 Tighten the roof and smash the cavity of the butterfly nut.
  , Start the motor, empty rotation for 1-2 minutes, then playing from the feed tray gradually feeding materials, the feed should not be too much too fast.
  4, in case of jammed materials, the motor does not turn, immediately turn off, to prevent motor burn, to be cleared by the card materials, you can continue to use.
  5, universal grinder during use is strictly prohibited open the cover and the hand inserted into the crush cavity.
  6, the universal grinder of dry mill, and should not be crushed wet material and oily matter.
  7, depending on the desired switch to a different screen.
  Maintenance and repair of Groove Mixer
  Often use the Groove Mixer reducer shall be every three months a new oil replacement should the reducer after cleaning with new oil.
  Groove Mixer parts regular monthly check 1-2 times, check the site for the worm, worm, bearings, oil seals, all working parts are flexible, fastener loosening, irregularities should be promptly dealt.
  During use, such as Groove Mixer vibration anomalies or makes unusual sounds, you should immediately stop check.
  Groove Mixer electrical control components shall be kept clean and sensitive, and found that the fault should be repaired in time.
  Stirrer assembly and disassembly when light demolition, stable equipment, light, and to avoid distortion damage.
  After use, the various parts of the residual materials should brush Jing Groove Mixer, disabled for a long time, must be Groove Mixer all wipe clean the parts coated with anti-rust oil, tarpaulin cover.
  Rock particles, machine maintenance instructions:
  Regularly check swing particles machine parts, conducted once a month, check the worm, worm, lubrication on the bolt, bearings and other activities segment is rotating flexible and wear, and found that the defects should be repaired in time, shall not be reluctant to use.
  2, rock particles, machines should be placed on a clean dry indoor use, and shall contain acids and other corrosive gases to the body circulation spaces in the atmosphere.
  Rotating drum, rock particles machine after use, or stop, should be removed for cleaning and brush remaining powder will clear bucket, and then installed and ready for the next use.
  Automatic granule packing machine Lubrication:
  1, the box part of the rock particles, equipped with a fuel gauge, before driving all the grease once halfway according to the bearing temperature rise and functioning of the addition.
  , Worm gear box must be long-term storage of oil, the oil surface height for the worm all invasive oil, such as the frequent use of every March, a new oil once a provincial judge bottom drain plug, you can put the oil.
  3, in the rock particles to refuel, do not make the oil overflow cup, not to flow to the rock particles around the machine and ground. Because the oil is easy to material contamination, affecting product quality.
Related News:
· Innovation, energy saving, environmental protectio  
· Vacuum dryer product performance characteristics a  
· Vacuum dryer used for inspection and debugging wor  
· Difficulties and reasons cannot start mixing machi  
· The correct operation method using vacuum dryer  
· Development advantages and characteristics of dome  
· The difference between the special vacuum dryer an  
· Detailed description of each component characteris  
· The dominant position in the whole vacuum dryer dr  
· Trough type mixer sometimes appear large area leak  
Related Products:
· PGL Spray Drying Granulator
· High speed mixer
· SET series double screw extrusion pelletizer
· VI forced mixer
· Mixing machine W series
· Powder machine ZSJ series vibrating screen
· FZ series of crushing granulator
· Chinese medicine grinder
· DWT series of drier for dehydrated vegetables
· Multi-layer belt dryer

Copyright 2013 Chang Zhou Zhizun Machinery Co.,Ltd All Rights Reserved.Design by Reach.
Tel:86.519-88906508 Fox:86.519-88902679 Add:Jiaoxi Changzhou Jiangsu Pro China P.C:213116

乱人伦精品视频在线观看| 国产精品人妻一码二码| 人妻丰满熟av无码区hd| 亚洲性视频免费视频网站| 最新国产精品无码| 漂亮人妻中文字幕丝袜| 国产精品对白交换视频| 无码区国产区在线播放| 久久中文字幕乱码久久午夜| 午夜一区二区亚洲福利vr| 久久视热这里只有精品| 18禁h免费动漫无码网站| 天堂在线www天堂中文在线| 久久久亚洲一区二区三区 | 亚洲成av人片在线观看高清| 在线亚洲高清揄拍自拍一品区| 亚洲人成线无码7777| 国产在线不卡一区二区三区| 亚洲精品成人片在线播放| 欧美不卡一卡二卡三卡| 国产免费看插插插视频| 久久亚洲精品无码av宋| 国内精品久久久久久久影视麻豆| 成人精品一区日本无码网| 99精品国产一区二区三区a片| 亚洲宅男精品一区在线观看 | 久久亚洲中文字幕无码| 亚洲中文字幕无码永久| 东北少妇不戴套对白第一次| 极品少妇伦理一区二区| 香蕉伊蕉伊中文视频在线| 国产丝袜一区视频在线观看| 少妇被粗大的猛烈进出69影院一| 亚洲成av人影院无码不卡| 欧美不卡一区二区三区| 色情无码一区二区三区| 成人网站免费观看入口| 亚洲精品白浆高清久久久久久| 粉嫩小泬视频无码视频软件| 农村老熟妇乱子伦视频| 国产在线精品成人一区二区|